Skip to main content
newcastle.info

The Tyne bridges

From the Tyne Bridge to the Millennium Bridge

The Tyne, Swing, High Level and Millennium bridges link Newcastle upon Tyne and Gateshead, and the Tyne Bridge restoration is due to finish before October 2028.

The Tyne Bridge spanning the River Tyne, with the Quayside buildings behind
On this page

The bridges between Newcastle and Gateshead

The River Tyne separates Newcastle upon Tyne on the north bank from Gateshead on the south bank, and a short stretch of river below the city centre carries several of its bridges. Heading upstream from the east, the Gateshead Millennium Bridge comes first, then the Tyne Bridge, the Swing Bridge and the High Level Bridge. Together they frame the Quayside on the Newcastle side and Gateshead Quays opposite.

For visitors, the bridges matter in two ways: as the walking routes between the two banks, and as the backdrop of the riverside itself.

The Tyne Bridge and its restoration

The Tyne Bridge is being restored, with the work due to finish before October 2028. The four-year programme began on 2 April 2024 with work on the main deck, when one lane in each direction and one footway stayed open. Work on the main arch is planned for 2027. A decision on funding for the approach spans is due in autumn 2026, and funded work on them could run until March 2030.

From Friday 23 October 2026, 23:00, to Monday 2 November 2026, 05:00, the Tyne Bridge is closed to all traffic, including people on foot and by bike; the Millennium, Swing and High Level bridges stay open for walkers. In November 2026 the bridge closes to vehicles Monday-Friday 20:00-06:00, while people on foot and by bike can still cross. A height limit of 4.95 m applies to vehicles during this phase.

Gateshead Millennium Bridge

The Gateshead Millennium Bridge opened in September 2001. It was designed by Wilkinson Eyre with the engineers Gifford. To let ships through, the whole bridge tilts like an opening eyelid, giving 25 m of clearance below.

The bridge lands directly at Gateshead Quays, beside BALTIC and The Glasshouse, which makes it the most direct link between the Quayside and the Gateshead bank.

Crossing on foot

Most walks between Newcastle and Gateshead use one of four bridges:

  • Millennium Bridge: from the eastern Quayside straight to Gateshead Quays
  • Tyne Bridge: open to people on foot again from Monday 2 November 2026, 05:00, also during the night closures for vehicles
  • Swing Bridge: at the western end of the Quayside, below the castle
  • High Level Bridge: upstream of the Swing Bridge, towards Gateshead town centre

While the Tyne Bridge is closed, the Millennium, Swing and High Level bridges carry everyone on foot. From BALTIC, the city centre and Central Station are 15-20 minutes on foot.

Seeing the bridges from the Quayside

Between the Swing Bridge and the Millennium Bridge, the Quayside walk on the north bank passes the Tyne Bridge, and the High Level Bridge stands upstream of the Swing Bridge. On Sundays the Quayside Sunday Market runs along the river from the Swing Bridge to near the Millennium Bridge, so a market visit doubles as a bridge walk. Above the western end, Newcastle Castle stands on the slope between the river and the station. The things to do page covers the rest of the city.

Frequently asked questions

When will the Tyne Bridge restoration finish? +
The restoration is due to finish before October 2028, with work on the main arch planned for 2027. Funded work on the approach spans may run until March 2030.
Is the Tyne Bridge closed? +
From Friday 23 October 2026, 23:00, to Monday 2 November 2026, 05:00, the Tyne Bridge is closed to all traffic, including people on foot and by bike. In November 2026 it closes to vehicles Monday-Friday 20:00-06:00.
Which bridges can you walk across? +
The Millennium, Swing and High Level bridges stay open for walkers throughout. People on foot and by bike can use the Tyne Bridge again from Monday 2 November 2026, 05:00, including during the night closures for vehicles.
Who designed the Gateshead Millennium Bridge? +
The bridge was designed by Wilkinson Eyre with the engineers Gifford and opened in September 2001.
Where can you see all the bridges? +
From the Quayside the Tyne, Swing and High Level bridges stand together at the western end, with the Millennium Bridge further east. The Gateshead bank by BALTIC gives the view back across the river.

Continue planning